Blog
Field notes
On data your operation can trust, Business Central without drama, and supply chains that stop leaking margin. No smoke.
Not All BOMs Are the Same, and That Distinction Cost Us a Redesign
A Bill of Materials is not one object, it is a family of structures, and picking the wrong one is an architecture mistake, not a data entry preference. EBOM vs MBOM, single vs multi level, phantom and planning BOMs, and the provincial-SKU redesign that taught me the difference.
Read →MRP won't start without clean data (and other shop-floor truths)
Everyone wants automated planning. Few want the boring work that makes it trustworthy. Notes on getting an operation ready so MRP is actually useful.
Read →Master data isn't glamorous. That's why it breaks your ERP.
Nobody brags about a well-governed item table. But it's the first thing that blows up when an implementation is rushed. Three early signs your master data is about to cost you.
Read →